Traffic Alerts
Road closures, construction, and getting around the San Tan Valley area.
Night Utility Work Scheduled at Bella Vista and Schnepf Roads
Residents traveling near Bella Vista Road and Schnepf Road should be aware of upcoming night utility work that will affect the intersection throughout the next week.
Beginning December 15 and continuing through December 23, crews will be installing new water and gas mains in the area. Work will take place nightly from 7 p.m. to 5 a.m.
Drivers can expect flagger operations, lane shifts, and reduced speeds while crews are on site. Motorists are asked to slow down, follow traffic control signs, and use caution when traveling through the work zone.
A map of the affected area is provided below for reference.
San Tan Valley drivers should plan for minor delays and allow extra travel time, especially during overnight hours.
EXPLORE
GET INVOLVED
ABOUT & CONNECT
SanTanValley.com, a partner of the San Tan Valley Alliance (501(c)(3)). All rights reserved. Content on this site, including articles, images, and downloadable files, may not be reproduced or republished without written permission from SanTanValley.com representatives. Opinions and comments posted by visitors do not reflect the views of SanTanValley.com.
Comments